Specifications for "SRFT" Teller Window

PART I  GENERAL

1.1 Scope of Work
A.  The work required includes furnishing and installing  bullet resisting Teller Window Assemblies of the sizes  and quantities indicated.
B. The bullet resistant teller window assemblies must be  Underwriters Laboratories listed and bear a U.L. Label  for the                                                           ballistic threat level as defined by the standard of      Safety U.L. 752 bullet resistant equipment.

NOTE to the specifier:  If the window must have a higher ballistic rating than those tested by U.L., then use this working: "The bullet resistant teller window assemblies shall be manufactured to resist the     (insert weapon, ammo type and number of shots it must resist)                          ."

1.2 Approval Drawings
A. Manufacturer shall provide owner with drawings that  sufficiently indicate sizes, details and installation  procedures of the bullet resistant teller window  assemblies required.  These drawings will be submitted to  the owner within five (5) working days.

PART II  PRODUCTS

2.1 Bullet Resistant Window Framing
A. Materials - All bullet resistant frames will be  manufactured from Balistex(R) 38P bullet resistant steel  in accordance with UL
® 752. (For higher ballistic  levels, delete UL® 752 and add: "The manufacturers  independently tested assemblies to resist the specified  ballistic level.")
B. Construction -
  1. The window framing shall be framing type SRFT is    manufactured by NATIONAL BULLET PROOF, INC., 1-800-  323-2649, or equal.
  2. The framing shall be welded and include all    accessories and be U.L. Listed MPSA.
  3. The frames shall be mitered corners for a neat and    tight seam after assembly.
  4. Finish of the frames shall be prime painted.    (Option: stainless steel)
  5. Manufacturer shall provide anchoring preparation as    required for a proper installation.




2.2 Bullet Resistant Deal Trays
A. Materials - The deal tray for the bullet resistant teller  windows will be manufactured of Balistex(R) stainless  steel in accordance with U.L. 752.

B. Construction -
  1. The deal trays will be provided as indicated on
    the approved drawings.
  2. Each teller window will be provided with ________
  deal tray(s) for each teller window unit.
  3. Each deal tray will be of the appropriate design,    material and tolerances as required to maintain the    protection level MPSA as tested by Underwriters    Laboratories.
  4. (Optional) The deal tray shall include a 6-1/2"    ledge on the exterior (and/or interior) side of the    window.  The ledge shall be stainless steel and be    part of the deal tray system.

2.3  Bullet Resisting Glazing
A. Materials - The bullet resistant glazing shall be U.L.  Listed for the ____ ballistic threat level and consist of  laminated glass with polyvinyl interlayer ______" thick  or equal.

PART III  EXECUTION

3.1 Site Work - The installer of the bullet resistant teller  window assemblies will be responsible to assemble the framing,  anchor deal trays and framing to surrounding wall (to be built  by buyer) and install the bullet resistant glass for a  complete installation.